Renting an industrial warehouse in the Dominican Republic takes more than a passport copy and a security deposit. The landlord reviews the legal and financial standing of your company and whether your operation fits the building; you, as the tenant, need to confirm that the warehouse can support your production for years. Since 2025, the new rental law (Law 85-25) has also set fresh rules for the lease and the deposit.
At PID we have supported industrial and free zone companies through this process for more than 40 years. This guide covers what you should prepare, verify and negotiate before signing, so you reach the table with your file in order and avoid surprises after move-in.
In this guide
Corporate documents the landlord will request
Before approving a lease, the owner or park operator confirms that your company legally exists and that the person signing has authority to do so. Having these documents ready and current speeds up the review and signals that you are a serious tenant.
| Document | Issued by | Why it is requested |
|---|---|---|
| Articles of incorporation and bylaws | The company, duly registered | Proves formal incorporation and corporate purpose |
| Current Commercial Registry certificate | Chamber of Commerce and Production | Confirms the company is active |
| Taxpayer number (RNC) | DGII (Dominican tax authority) | Invoicing, withholdings and tax receipts |
| ID of the legal representative | Dominican ID card or passport | Identifies the signatory |
| Board resolution or power of attorney | Shareholders or board of directors | Shows authority to enter into the lease |
| Tax compliance certificate | DGII (Dominican tax authority) | Shows the tenant is current on its tax filings |
If your company is foreign and has no local entity yet, start the incorporation in parallel. Most industrial landlords sign with a Dominican legal entity or with a duly registered branch, not with the overseas parent directly.
Financial requirements and guarantees
The landlord also assesses your ability to pay. An industrial warehouse is usually leased for a medium or long term, so the owner wants evidence that your company can perform for the full life of the contract.
- Recent financial statements, ideally audited, for the last two or three fiscal years.
- Bank and trade references that confirm the company’s track record.
- Security deposit, whose custody and refund are now regulated by Law 85-25.
- Joint and several guarantor, a figure the new law expressly recognizes and that the landlord may request.
- Insurance: general liability and, depending on the lease, coverage for contents and tenant improvements.
For newly formed companies, a corporate guarantee from the parent company or a guarantor with proven solvency usually offsets the lack of local history. International groups entering the country through nearshoring often use this route.
Permitted use and operating permits
The landlord needs to know exactly what the industrial warehouse will be used for. Dry storage does not carry the same demands as a line with heavy machinery, regulated substances or processes that generate noise, vibration or waste.
Declaring the real use from the start prevents disputes later. Law 85-25 lists among the grounds for terminating a lease a change of use that the owner has not expressly authorized, even if it causes the owner no harm.
Permits that may apply to your activity
- Environmental authorization from the Ministry of Environment and Natural Resources under Law 64-00, for processes with environmental impact.
- Sanitary registrations for food, beverages, cosmetics, pharmaceuticals and medical devices.
- Fire department and safety permits for storage of flammable materials or high-risk processes.
- Municipal land-use licenses when the building sits outside an industrial park.

Technical requirements for the building
Infrastructure is often the deciding factor. A well-located building with insufficient power or an unreliable water supply can stop your production. The table summarizes the technical requirements we recommend confirming in writing.
| Requirement | What to confirm | Risk if it fails |
|---|---|---|
| Electrical capacity | Available kVA, voltage, phases and room to expand | Machinery that cannot be connected or trips on startup |
| Power continuity | Source of supply and backup | Line stoppages and lost output |
| Water | Source, pressure, volume and fire reserve | Halted processes or safety non-compliance |
| Clear height | Height under the structure, net of light fixtures | Fewer rack levels and more floor stacking |
| Industrial floor | Load capacity and flatness | Cracks, forklift damage and unstable racks |
| Docks and access | Number of docks, dock height and turning radius | Truck queues and shipping delays |
| Fire protection | Sprinklers, hydrants, detection and exits | Insurer rejection and penalties |
For fire protection, the Ministry of Public Works publishes the R-032 fire safety and protection regulation (in Spanish). Review it with your engineer to see what the building already meets and what you would need to complete.
How to estimate your power and water demand
One of the most underestimated requirements is knowing your own demand. Without that figure, you cannot compare one industrial warehouse with another on equal terms. We recommend this simple method, which your electrical engineer should then validate.
- List your equipment: machinery, compressors, HVAC, refrigeration, lighting and offices, with the nameplate rating of each.
- Apply a diversity factor: not all equipment runs at once; your engineer will set the real usage factor per shift.
- Convert to kVA: the capacity a landlord offers is usually stated in kVA, not kW.
- Add headroom for growth: include the machinery you plan to add over the next few years.
- Estimate water use: process water, sanitary use per employee and the reserve required for the fire system.
At PID we run our own electrical substation and a private aqueduct, which lets us size each tenant’s service with backing that a standalone building rarely offers. We explain these components in our guide to industrial park infrastructure.

Lease requirements under Law 85-25
Law 85-25 on Real Estate Leases and Evictions, passed in August 2025, replaced the old Law 4314 of 1955. It governs leases for housing, commerce and non-profit activities. Based on published summaries of the law, these are its most relevant requirements for an industrial or commercial lease:
- Written contract identifying the parties, describing the property in detail, stating its exclusive use, start and end dates, and an address for notices.
- Registration of the lease with the Civil Registry and Mortgage Recording Office of the municipality where the property sits.
- Deposit held in custody at Banco Agrícola or Banco de Reservas, together with a copy of the lease; the bank pays interest similar to a savings account.
- Justified withholding: if the owner keeps all or part of the deposit, the reasons must be notified in writing within five days.
- Automatic renewal if neither party states before expiration that it will not renew.
- Capped rent increase: an increase cannot exceed 10% of the current rent.
- Costs: brokerage is paid by the owner, and legal costs of the lease are split equally.
- Eviction only by court order; disputes over commercial leases are heard by the Court of First Instance.
Grounds for termination under the law
The law lists mutual agreement, expiration of the term or prior notice by one party, loss of the property through force majeure, failure to pay or meet other obligations, use for unlawful purposes and an unauthorized change of use. Your lease should develop each of these with clear timelines and procedures.
This information is for guidance only. We recommend reviewing the current text of the law and your lease with a Dominican attorney before signing.
Tax obligations on an industrial lease
Rent on commercial and industrial premises is subject to ITBIS, the Dominican value-added tax, at the general rate of 18%, according to the DGII (Dominican tax authority). When comparing offers, confirm whether the quoted rent includes that tax.
If the owner is an individual, your company must also withhold 10% income tax on rent payments, plus the withholding on the ITBIS invoiced, under the withholding rules. If the landlord is a company, a valid tax receipt is the document that supports the expense. Your accountant should define the exact treatment before the first payment.
What to verify before you sign
Due diligence is not only the landlord’s job. As a tenant, inspect the building and review the lease with the same rigor the owner applies to your company.
Physical and technical condition
- Structure: roofs, columns, foundations, leaks and corrosion.
- Systems: electrical panels, piping, drainage and working fire systems.
- Access: road width, turning radius and capacity for trucks hauling 40-foot containers.
- Security: access control, surveillance and perimeter, especially if you hold high-value inventory.
Lease clauses
- How maintenance is split across structure, roofs, systems and common areas.
- Rules for improvements and what happens to them when the lease ends.
- Early termination penalties and the option to assign or sublease.
- Right of first refusal on adjacent space so you can grow.
Improvements and the exit
Many industrial tenants invest in mezzanines, offices, cold rooms, compressed-air lines or electrical upgrades. Before spending on any of them, agree in writing which improvements need the owner’s prior approval, which ones stay with the building and which ones you may remove when you leave.
The same logic applies to the return of the premises. Define the condition in which the building must be handed back, normal wear and tear, and how long the owner has to inspect it. Tying these terms to the initial handover report makes the final settlement of the deposit far more predictable for both parties.

Steps for renting an industrial warehouse
Every transaction has its own details, but the process follows a sequence worth planning well ahead:
- Define your requirements: square meters, clear height, power, water, docks and location.
- Shortlist: rule out options that do not meet your minimums.
- Technical site visit: walk the building with your engineer and your logistics lead.
- Submit your file: corporate and financial documents for the landlord’s review.
- Negotiate: rent, deposit, term, improvements and exit conditions.
- Legal review and signing: a written lease that complies with current law.
- Registration and deposit: register the lease with the municipality and place the deposit with the bank.
- Handover report: an inventory of the building’s condition with photographs.
For sizing criteria and total occupancy cost, see our guide to industrial warehouse rentals in Santo Domingo.
Additional requirements inside a free trade zone
If your company exports and will lease inside a free zone park, the requirements change. Law 85-25 excludes free zone parks and companies that operate under their own legislation, so the relationship is governed by Law 8-90 and by the rules of the National Free Zones Council (CNZFE).
The CNZFE requires that the application for an installation permit include the lease or a letter of intent from the park. In other words, the negotiation with the park is part of the free zone application itself. We walk through it in our guide to setting up a business in a Dominican free trade zone, and the incentives are covered in our overview of the free trade zone and Law 8-90.
One-page requirements checklist
To make internal preparation easier, we have grouped the requirements by area along with the person who usually owns each one. You can use this table as a checklist before your first meeting with the landlord.
| Area | Main requirements | Usual owner |
|---|---|---|
| Legal | Articles of incorporation, commercial registry, signatory’s authority, lease review | Legal counsel |
| Tax | Active RNC, good standing with the DGII, ITBIS and withholding treatment | Accountant |
| Financial | Financial statements, bank references, deposit, guarantor or corporate guarantee | Finance |
| Technical | kVA demand, water use, clear height, floor, docks and access | Engineering or operations |
| Regulatory | Environmental authorization, sanitary registrations and safety permits by industry | Quality or compliance |
| Insurance | General liability and coverage for contents and improvements | Finance or administration |
Assigning each area to an owner from day one prevents the most common bottleneck: an advanced negotiation that stalls because a corporate document is missing or a certificate has expired.
Common tenant mistakes
In our experience, most problems after signing come from requirements that were not reviewed in time.
- Not knowing your own power demand: the lease is signed by floor area, and only later does the tenant discover the service is too small.
- Declaring a use other than the real one: beyond the legal risk, it can void insurance coverage.
- Skipping lease registration and deposit custody: with Law 85-25 in force, both protect each party.
- Comparing rents with inconsistent ITBIS treatment: an offer that includes tax and one that does not are not comparable.
- Taking possession without a handover report: without a record of the initial condition, prior damage can be deducted from your deposit when you leave.
- Not negotiating for growth: moving after two years for lack of space costs more than securing a first right on adjacent space from the start.
Industrial park or standalone building
A standalone building may look attractive on price or for a specific location, but it shifts responsibility for utilities, security and upkeep of the surroundings to the tenant. An industrial park solves those requirements at scale.
- Shared infrastructure: power, water and internal roads managed by a single operator.
- 24/7 security and access control for the entire site.
- Free zone regime available for export operations.
- Growth without relocating: the option to move into a larger warehouse, a lot or a build-to-suit project on the same site.
- Industrial land use with no conflicts with residential neighbors.
At PID we combine our own substation and aqueduct, more than 40 years of operation and the CFI.co 2025 award, with warehouses from 500 to 5,000 m² and lots from 1,000 to 100,000 m² (10,764 to 1,076,391 sq ft). We compare both alternatives in our guide on the advantages of an industrial park over a standalone warehouse.

If you would like to review your requirements with our team, browse the available industrial spaces, write to us through our contact page, or call +1 (809) 559-9011.
Frequently asked questions
What are the requirements for renting an industrial warehouse?
Current corporate documents (articles of incorporation, commercial registry, RNC and the signatory’s authority), financial information, a deposit and guarantees, and a description of your activity to confirm the permitted use. Depending on your industry, environmental or sanitary permits may also apply.
How much of a deposit is required to lease an industrial warehouse?
The amount is negotiated, but Law 85-25 regulates the deposit: it must be held at Banco Agrícola or Banco de Reservas, it earns interest, and any withholding must be justified in writing. Agree on the amount and refund conditions in the lease.
Does the lease have to be registered?
Yes. Under Law 85-25, the lease must be in writing and registered with the Civil Registry and Mortgage Recording Office of the municipality where the property is located.
Is ITBIS charged on industrial warehouse rent?
Yes. Rent on commercial and industrial premises is subject to ITBIS at the general rate of 18%. If the owner is an individual, the tenant company must also apply the income tax and ITBIS withholdings required by the rules.
Are the requirements the same inside a free trade zone?
No. Free zone parks and companies operating under their own legislation are excluded from Law 85-25. Law 8-90 and the CNZFE rules apply instead, and the CNZFE asks for the lease or the park’s letter of intent as part of the installation permit.
What should I check in the building before signing?
Electrical capacity in kVA, power continuity, water, clear height, floor load capacity, docks, truck access and fire systems. We recommend visiting with an engineer and recording the building’s condition in a handover report.
